SSNPCBL - 2019 Cross Drain Replacement - Engineering Services -- 2019A-01006
SaskWater requires professional engineering and geotechnical services to undertake the design, contractor pre-qualification, tender and construction supervision and post-construction services for the replacement of a large diameter cross drain on Reach 1 of the canal system near Broderick, SK. This work includes the replacement of the existing 1.8 m diameter CSP cross drain with a new single or dual cross drain at STA 8+233 on Reach 1. Construction shall be substantially complete by November 15, 2019 and total project completion must be reached by May 15, 2020.
No additional information for this competition.
|
Jun 13, 2019 02:02 PM CST
|
|
May 24, 2019 01:05 PM CST
|
|
Jun 13, 2019 02:00 PM CST
|
Daryl Bunnell
daryl.bunnell@saskwater.com
Saskatchewan Water Corporation
200 - 111 Fairford Street East
Moose Jaw, SK, Canada
S6H 1C8
Competition Information
Closed
|
2019A-01006
|
Saskatchewan Water Corporation
|
SSNPCBL - 2019 Cross Drain Replacement - Engineering Services
|
Request for Proposal
|
No
|