Hamel Bridge Replacement - NE 20-41-12 W2 -- NE-20-41-12-W2

The existing 5-Span bridge located downstream from Barrier Lake ( Approximatly 1.5 km ) and over the Barrier River has reached its service life and is needing to be replaced. This bridge is referred to by the RM of Bjorkdale as the Hamel Bridge. 

Items of work to be completed within this contract are as follows: 

  • Traffic Accommodation and traffic signs at the bridge site only
  • Dismantling of the existing bridge
  • Removal and disposal of existing surfacing
  • Disposal of unsalvagable treated timber
  • Hauling and Stockpiling of salvageable treated timber to nearby yard
  • Disposal of existing bridge materials
  • Excavating of the existing roadway approach embankment to form the abutment, spill-through slopes, and to facilitate the construction of the abutments
  • Supply and Construction of all substructure components
  • Placement of granular filter blanket and riprap slope protection
  • Supplying, hauling, placing, and compacting granular backfill material and earth backfill material behind both abutment backalls as identified on the Plans
  • Erection of precast prestressed concrete stringers
  • Preparing the road for surfacing on the completed bridge and approaches
  • Installation of side mounted Type 4 Steel Bridgerails
  • Installation of collapsible hazard markers
  • Miscellaneous construction activities identified on the Plans and in the Special Provisions

 

If your company is able to commit the necessary resources to meet the requirements of this invitation to tender and to complete this project on behalf of the Rural Municipality of Bjorkdale No. 426 then you are requested to please submit your proposal. 

All proposals must be received by the Rural Municipality of Bjorkdale No. 426 via email, rm426@sasktel.net, by no later than 2:00 PM on September 5th, 2022. Proposals must also be accompanied by a Bid Bond or Certified Cheque in the amount of not less than 5% of the Total Bid Amount payable to the Rural Municipality of Bjorkdale No. 426.

Should your bid be accepted by the RM, the Undersigned Bidder agrees to furnish the Performance Bond, the Labour & Material Payment Bond, and the Proof of Insurance pursuant to subsections 1200.10 and 1200.11 of the General Provisions.

Contractors are requested to refer all questions by email to: udara.heendeniya@stantec.com

Competition Documents:
PDF
rm426-2022-01-standard_moh_plans.pdf
PDF
|
4.64 Mb
|
Added: Aug 04, 2022
PDF
rm426-2022-01-permits_combined.pdf
PDF
|
513.25 Kb
|
Added: Aug 04, 2022
PDF
rm426-2022-01-1584a_combined (1).pdf
PDF
|
11.31 Mb
|
Added: Aug 04, 2022
PDF
rm426-2022-01-Standard Test Procedures.pdf
PDF
|
1.83 Mb
|
Added: Aug 04, 2022
PDF
rm426-2022-01-Standard Specs.pdf
PDF
|
1.64 Mb
|
Added: Aug 04, 2022
PDF
rm426-2022-01-General Provisions.pdf
PDF
|
1.68 Mb
|
Added: Aug 04, 2022
PDF
rm426-2022-01-1584_exg_plans.pdf
PDF
|
4.11 Mb
|
Added: Aug 04, 2022
PDF
rm426-2022-01_sp_bjorkdale_final.pdf
PDF
|
459.5 Kb
|
Added: Aug 04, 2022
PDF
rm426-2022-01_bid_form_bjorkdale_final.pdf
PDF
|
319.51 Kb
|
Added: Aug 04, 2022
Amendment Documents:
PDF
Hazard Markers Typical Plan.pdf
PDF
|
40.54 Kb
|
Added: Aug 10, 2022
PDF
Addendum 1
PDF
|
205.87 Kb
|
Added: Aug 10, 2022
 Aug 10, 2022 06:15 PM CST
 Aug 05, 2022 12:00 AM CST
 Sep 05, 2022 02:00 PM CST
Contact
Cherie Hudon
306-886-2470
rm426@sasktel.net
Response Address
RM of Bjorkdale
Box 60
Bjorkdale, SK, Canada
S0E 0E0
Competition Information
Open
NE-20-41-12-W2
Rural Municipality of Bjorkdale No. 426
Hamel Bridge Replacement - NE 20-41-12 W2
Invitation to Tender
No
The Competition detail was successfully retrieved. Aug 17, 2022 04:23 PM CST