East RM Watermain Install -- CSC-21-E-025

The Work generally comprises:

Supply and Installation of approximately 2km of 100 mm diameter High Density Polyethylene (HDPE) watermains by open cut and/or trenchless methods including installation of casing pipe through existing Coulee and installation of related piping appurtenances and connections;

Disinfection and Pressure testing;

Site civil works, including landscaping and overall site restoration;

Surface Restoration;  Traffic Accommodations;

Repair of defects for one year after completion of work, or such longer periods as specified in the Contract Documents; and  Work is inclusive of all site works, surface works and underground utility construction as per Contract Documents.

Electronic copy in PDF to be electronically submitted to the email address given below before 2:00:00 p.m., local time, on August 10, 2021

Inquiries regarding this Project shall be directed to: City of Swift Current 2074 South Service Road West PO 340 Swift Current, SK S9H 3W1 Attention: Craig Knudsen - Email: C.knudsen@swiftcurrent.ca

No additional information for this competition.
Competition Documents:
Amendment Documents:
Award Documents:
Award Details
 Sep 13, 2021 09:10 AM CST
 Jul 27, 2021 09:25 AM CST
 Aug 11, 2021 02:00 PM CST
Contact
Craig Knudsen
13067782763
c.knudsen@swiftcurrent.ca
Response Address
City of Swift Current
P.O. Box 340
Swift Current, SK, Canada
S9H 3W1
Competition Information
Awarded
CSC-21-E-025
City of Swift Current
East RM Watermain Install
Request for Proposal
No
The Competition detail was successfully retrieved. Apr 25, 2024 04:07 PM CST