"Path of the People" Repair at the Wanuskewin Heritage Park -- RM2025-05

1. Repair all observed surface damage on a 108 meter by 2 meter section of the “Path of the People” trail section, including filling drainage channels with suitable materials, raising the trail surface above its surroundings, surface leveling, and use of soil solidification products to ensure repair stability.
2. Implement erosion control/mitigation strategies to prevent further erosional damage, through either installation of drainage structures and/or landscaping techniques such as rolling grade dips, and
3. Smooth the trail’s surface conditions to provide a safe and easily accessible trail section for mobility-impaired individuals.

1.Project Timeline & Submission Instructions

RFP Opening Date:                                           12:00 PM, C.S.T. Friday, March 14, 2025

Confirmation & Intent to Bid Deadline:               5:00 PM, C.S.T. Monday, March 31, 2025

Mandatory Site Meeting:                                    1:00-3:00 PM, C.S.T. Tuesday, April 15, 2025

Inquiries Deadline:                                              5:00 PM, C.S.T. Friday, May 02, 2025

Submission Deadline:                                         5:00 PM, C.S.T. Friday, May 16, 2025

 

Competition Documents:
PDF
RFP -Path of the People Repairs.pdf
PDF
|
636.23 Kb
|
Added: Mar 14, 2025
DOCX
RFP Path of the People Repairs at the Wanuskewin Heritage Park Supplemental Information.docx
DOCX
|
12.22 Mb
|
Added: Mar 14, 2025
 Mar 14, 2025 12:00 PM CST
 Mar 14, 2025 12:00 PM CST
 May 16, 2025 05:00 PM CST
Contact
Shelby Redman
306-931-6767
pmc@wanuskewin.com
Response Address
Wanuskewin Heritage Park
RR#4 Penner Road
Saskatoon, SK, Canada
S7K 3J7
3069314522
Competition Information
Open
RM2025-05
Wanuskewin Heritage Park Authority
"Path of the People" Repair at the Wanuskewin Heritage Park
Request for Proposal
No
The Competition detail was successfully retrieved. Apr 22, 2025 01:31 PM CST