Town of Lemberg Wastewater Lagoon Expansion -- PAL-2459

Work included in this contract is as follows:

  • Construction of a new lagoon storagecell (Option for Compacted Clay Liner (CCL) or Geosynthetic Clay Liner (GCL))
  • Sludge removal from two existing lagoon cells and relining of each with GCL
  • Installation of new equalization/overflow pipes
  • Decommissioning and Replacement of existing sewage forcemain
  • Installation of new manhole control structure

A non-mandatory pre-bid meeting will take place at the Site location on March 04, 2020 at 10 am. Send intent to attend by March 02,2020 to kevin.mathison@pinter.ca with subject "Re: Lemberg Lagoon Site Visit".

No additional information for this competition.
Competition Documents:
Amendment Documents:
 Mar 24, 2020 10:15 AM CST
 Feb 26, 2020 04:00 PM CST
 Mar 19, 2020 03:00 PM CST
Contact
Kevin Mathison
306-244-1710
kevin.mathison@pinter.ca
Response Address
PINTER & Associates Ltd.
710A 48th Street East
Saskatoon, SK
S7K 5B4
Competition Information
Closed
PAL-2459
Town of Lemberg
Town of Lemberg Wastewater Lagoon Expansion
Request for Bid
No
The Competition detail was successfully retrieved. Apr 19, 2024 11:24 AM CST