Roadwork-REMOVAL, DISPOSAL OF CULVERT, REPLACED BY A SKEW BRDIGE: CS: 3-03 -- HWY-B25091-APPN
Purpose of this Advance Proposed Procurement Notice
This is an advance notice for the procurement of a Contractor to complete a Culvert-to-Bridge replacement on C.S. 3-03, over Prairie River located approximately 0.53 km east of Prairie River Access Rd. Please note that all quantities and project details are subject to change. This tender will have a shortened advertising period with a Winter Phase I completion date. The work is expected to take place as early as November 15, 2025. Tender documents will be added to Sasktenders when available. The Ministry reserves the right to not proceed with advertising this work.
Description of the Procurement
The roadway on Highway No. 3 has been excavated to expose the partially collapsed 17’10” (5.44m) width x 9’11” (3.02m) height galvanized oval corrugated metal culvert. The damaged portion of the culvert has been removed to allow stream flow, and the excavated earth material is stockpiled on site. C.S. 3-03 over Prairie River is closed off and traffic is diverted to local RM detour. The current local RM detour is maintained by others and shall be in place until February 28, 2025, or until the opening of the new bridge on temporary surfacing, whichever is earlier. The existing culvert shall be removed and replaced with a 3-span, 12m – 15m – 12m, 11m width, 30o LHF skew bridge. Contractors are encouraged to visit the site prior to bidding.
Any questions regarding the above can be sent to RFXquestions@gov.sk.ca.ca with the subject line: “B25091– Advance Notice”.
Tender document will be added when available.
Estimated Quantities:
Precast Prestressed Concrete Stringer Erection: 1 lump sum
Foundation Excavation: 1 lump sum
Widening Of Approach Embankments: 1 lump sum
Asphalt Concrete In Place: 150 t
Supply And Installation Of Sheet Piling: 1 lump sum
Supply Of Piling: 600 m
Completion Date: Phase I: February 28, 2026
Phase II: June 30, 2026
Deposit with each Tender - 5% of total bid.
Deputy Minister of Highways
Award Documents:
Award Details
Minty's Moving Ltd.
Onanole, MB
$1,716,008.40
Nov 04, 2025
|
Minty's Moving Ltd.
|
Onanole, MB
|
$1,716,008.40
|
|
Nov 04, 2025
|
|
|
Nov 04, 2025 11:41 AM CST
|
|
|
Oct 09, 2025 02:00 PM CST
|
|
|
Oct 27, 2025 02:00 PM CST
|
SBP Construction
RFXquestions@gov.sk.ca
Ministry of SaskBuilds and Procurement
submission@gov.sk.ca
Competition Information
|
Awarded
|
|
HWY-B25091-APPN
|
|
Highways
|
|
Roadwork-REMOVAL, DISPOSAL OF CULVERT, REPLACED BY A SKEW BRDIGE: CS: 3-03
|
|
Invitation to Tender
|
|
No
|
The Competition detail was successfully retrieved. Nov 14, 2025 09:04 AM CST