The scope of this project is an alteration of the existing heating and plumbing systems including the following:

Replacement of the existing heating boiler plant and associated pumps, valves, pipe, controls, venting, and accessories in their entirety,
Replacement of the existing domestic hot water heating plant including installation of a new boiler plant and modification of piping, storage tanks, valves, controls and accessories.
Replacement of heating system distribution pumps and associated pipe, valves, controls and accessories.
Replacement of addition hydronic piping within the mechanical room.

Substantial completion August 15, 2022

A visit to project site has been arranged for Bidders as follows: Swift Current Composite School, 1100 11th Ave NE, Swift Current, Saskatchewan – Tuesday November 30, 2021 at 10:00 AM local time.  Initially meet at the north exterior Boiler Room door.

All bidders are required to pre-register for the walkthrough.

Masks and hand sanitization shall be utilized by all personnel attending the site meeting.  Masks and sanitization shall be provided by individual Contractors, Chinook School Division will not provide masks or hand sanitizing stations. Use of hand sanitizer, or handwashing, will be required upon entry and exit to the building.

Anyone travelled out of side of Canada in the past 14 days, from date of walk through, will not be permitted entry to the building.
Anyone presenting COVID-19 symptoms will not be permitted at the walk through.
Social distancing must be maintained while on site.

The Chinook School Division policy requires a "Proof of Vaccination" /or negative test for all workers on site.

Competition Documents:
Amendment Documents:
Award Documents:
Award Details
 Mar 14, 2022 02:10 PM CST
 Nov 25, 2021 08:05 AM CST
 Dec 14, 2021 02:00 PM CST
Contact
Ted Cooke
1-306-525-9815
tcooke@hdaeng.com
Response Address
HDA Engineering Ltd.
2334 8th Ave
Regina, SK. Canada
S4R 1G3
Competition Information
Awarded
CSD-SCCHS-21077
Chinook School Division No. 211
Swift Current Comprehensive High School Boiler replacement
Invitation to Tender
No
The Competition detail was successfully retrieved. Jul 05, 2025 04:30 PM CST