Roadwork-SUPPLY&INSTALL 2 STEEL PIPE CULVERTS by excavation and boring Total Length 85m CS: 39-04 -- HWY-H25028
SUPPLY AND INSTALLATION OF ONE 1 500 mm DIAMETER SMOOTH WALL STEEL PIPE by open excavation of the roadway and ONE 1 500 mm DIAMETER SMOOTH WALL STEEL PIPE CULVERT by boring on Highway No. 39 approximately 100 m east of the junction with Highway No. 35; for a TOTAL LENGTH OF 85 m.
Bidders shall submit all inquiries pertaining to the Bid Package documents a minimum of 3 business days prior to close of bidding directed to:
Ministry of SaskBuilds and Procurement
RFXquestions@gov.sk.ca
Bidders may request a debriefing session from Ministry of SaskBuilds and Procurement by emailing constructionsbp@gov.sk.ca within 30 days after the award notification date. The intention of the debriefing is to aid the Bidder by identifying areas of improvement that may be applied to subsequent procurement opportunities.
Estimated Quantities:
Supply And Install Smooth Wall Steel Pipe Culverts: 46 m
Supply And Installing Culverts By Tunnelling Or Boring, As Per Special Provisions: 39 m
Granular Backfill In Place: 1 080 t
Precast Concrete Manhole: 1 manhole
Completion Date: October 31, 2025
Deposit with each Tender - 5% of total bid
Deputy Minister of Highways
Competition Documents:
ZIP
H25028 Tender Documents
ZIP
|
4.9 Mb
|
Added:
Jun 03, 2025
|
Jun 03, 2025 10:15 AM CST
|
|
Jun 03, 2025 10:15 AM CST
|
|
Jun 18, 2025 02:00 PM CST
|
SBP Construction
RFXquestions@gov.sk.ca
Ministry of SaskBuilds and Procurement
submission@gov.sk.ca
Competition Information
Open
|
HWY-H25028
|
Highways
|
Roadwork-SUPPLY&INSTALL 2 STEEL PIPE CULVERTS by excavation and boring Total Length 85m CS: 39-04
|
Invitation to Tender
|
No
|
The Competition detail was successfully retrieved. Jun 06, 2025 04:03 PM CST