Nipawin Hydroelectric Station - New Access Road -- 1014883
This Contract is for the construction of a new ±1.25 km long gravel-topped access road to the east side of the Nipawin Hydroelectric Station (NHS) from a SaskPower Outpost Building adjacent to Highway 35. The Contractor shall also regrade and resurface approximately 815 m of the existing Main Dam embankment access road beyond the endpoint of new road construction at Sta. 1+250. The regrading and resurfacing work outside of the new road construction area shall extend all the way to the right abutment of the spillway concrete structure. Contractor shall provide all the material, labor, and equipment to complete this Work.
The Work also includes installation and removal of temporary erosion and sediment control measures; topsoil stripping; clearing and grubbing; excavation; embankment construction; supply and installation of non-woven geotextile; supply, placement, and compaction of granular sub-base course; supply, placement, and compaction of granular base course; grading, supply, and placement of traffic gravel on top of the new access road and Main Dam embankment; culvert installation, topsoil placement, and mechanical seeding.
This Request for Proposal is available on MERX, and all amendments, addenda, clarifications, and further instructions will also be posted on MERX. Documents can be downloaded at https://www.merx4.merx.com/saskpower.
|
Oct 29, 2024 05:30 PM CST
|
|
Oct 29, 2024 05:30 PM CST
|
|
Nov 26, 2024 03:00 PM CST
|
Stephanie Mckenzie
306-566-3051
procurementinquiries@saskpower.com
Saskatchewan Power Corporation
8SE - 2025 Victoria Avenue
Regina, SK, Canada
S4P 0S1
Competition Information
Open
|
1014883
|
Saskatchewan Power Corporation
|
Nipawin Hydroelectric Station - New Access Road
|
Request for Proposal
|
No
|
The Competition detail was successfully retrieved. Nov 19, 2024 01:26 PM CST