Hodgeville School Roof Replacement -- CSD-HOD-24091

The scope of Work consists of a Base Bid to replace 372m2 of ballasted EPDM

roofing system with an adhered SBS roofing system at Hodgeville School, 10 3rd

Avenue West, Hodgeville SK. There is a Separate Price to replace 1,224m2 of

existing EPDM membrane on the classroom section of roof with an SBS

membrane. Except as otherwise specified, the Work shall include the supply of

all labour, equipment, materials, fittings, fixtures and services necessary or

reasonably incidental to the completion of all Work shown on the drawings and

as specified.

A site walk-through for interested Contractors has been scheduled for Monday,

May 12, 2025 at 2:30pm. All interested parties to meet outside the front entrance

of the school.

Contractors wanting to attend the walk-through are to advise 1080 by emailing

ward@1080architecture.com by Friday, May 9, 2025 at 3:00pm.

Competition Documents:
PDF
24081 Hodgeville Roof IFT Drawings.pdf
PDF
|
1.85 Mb
|
Added: Apr 30, 2025
PDF
24081 Hodgeville Roof - IFT Specification.pdf
PDF
|
490.76 Kb
|
Added: Apr 30, 2025
 Apr 30, 2025 02:30 PM CST
 Apr 30, 2025 02:30 PM CST
 May 21, 2025 02:00 PM CST
Contact
Ward Peters
306-721-1080
ward@1080architecture.com
Response Address
1080 Architecture Planning & Interiors Ltd
1825 B Park St.
Regina, Sask.
S4N 2G8
Competition Information
Open
CSD-HOD-24091
Chinook School Division No. 211
Hodgeville School Roof Replacement
Invitation to Tender
No
The Competition detail was successfully retrieved. May 05, 2025 05:11 PM CST