Supply and Application of Gravelock -- RM159-25-05
Description of the Work: SUPPLY AND APPLICATION OF GRAVELOCK on Fleet Street and Tower Road; for a TOTAL DISTANCE OF 4.5 km.
The proposal is to supply GRAVELOCK, necessary equipment and manpower to complete the installation of GRAVELOCK to a depth of 200mm (8”). The proposal is based on the road top at approximately 9 m and the work would include:
Ripping the road surface approximately 8”
Mixing in the existing SB-90 into the subgrade
Supply and install the GRAVELOCK into the 8” SUBGRADE
Re-lay and compact material
Place gravel (supplied by owner)
Bid Closing Location, Date and Time: Sealed bids must be submitted to the RM of Sherwood No. 159 at 4400 Campbell St. Regina, Saskatchewan S4W 0L3 by 2:00 P.M. C.S.T. on June 13, 2025.
No additional information for this competition.
Competition Documents:
PDF
Contractor Occupational Health & Safety Compliance Form
PDF
|
184.17 Kb
|
Added:
May 23, 2025
PDF
Typicals
PDF
|
562.07 Kb
|
Added:
May 23, 2025
PDF
Location Plan
PDF
|
810.72 Kb
|
Added:
May 23, 2025
PDF
Special Provisions
PDF
|
790.13 Kb
|
Added:
May 23, 2025
PDF
Bid Form
PDF
|
800.36 Kb
|
Added:
May 23, 2025
|
May 23, 2025 11:02 AM CST
|
|
May 23, 2025 11:00 AM CST
|
|
Jun 13, 2025 02:00 PM CST
|
Joe McKay
306-985-9366
joe@rmofsherwood.ca
Rural Municipality of Sherwood No.159
P.O. Box 40029
Regina, SK, Canada
S4W 0L3
Competition Information
Open
|
RM159-25-05
|
Rural Municipality of Sherwood No. 159
|
Supply and Application of Gravelock
|
Invitation to Tender
|
Yes
|
The Competition detail was successfully retrieved. May 27, 2025 04:01 PM CST