Paskwaw Student Residences Dorm Renos Phase 3 -- 721010

The University of Regina is understaking a construction project (Phase 3) to renovate 12 existing Dorm rooms into 6 Accessible suites in the Paskwaw Tower building located on the Main Campus of the University of Regina. The renovation will include demolition of interior walls and all connected infrastructure. Access to the loading dock and elevator are excellent. There will be new millwork, flooring, electrical and mechanical revisions. All details and requirements are outlined in the attached Bid, Drawing Package and Photos. Due to COVID-19 Virus there will not be an onsite contractor walkthrough. In lieu of no site walkthrough, photos of the spaces have been provided. If additional information is required, please contact the Project Manager responsible for this project. In addition, an extensive COVID Protocol Safety Plan, reviewed and approved by the University, will be required by the successful Bidder. If you are unable to provide this, your Bid will be rejected. A Building Permit for this project has been submitted to the City by the Architect on the project.

Due to the COVID-19 issue, there will be no in-person site walk through for Contractors. In lieu of the walkthrough photos have been provided of the spaces that will be part of the scope of work. Site access to a loading dock and disposal bins is excellent. Elevator access is available to the upper floors where the construction will take place.

For further information regarding any photos or information provided please contact:

Project Manager - Wayne Nahnybida

Email - wayne.nahnybida@uregina.ca

Phone - 306-337-2593

Competition Documents:
PDF
A0.1
PDF
|
880.22 Kb
|
Added: Jun 09, 2021
PDF
A1.0
PDF
|
962.43 Kb
|
Added: Jun 09, 2021
PDF
A2.0
PDF
|
654.4 Kb
|
Added: Jun 09, 2021
PDF
A3.0
PDF
|
394.03 Kb
|
Added: Jun 09, 2021
PDF
M1.0
PDF
|
367.85 Kb
|
Added: Jun 09, 2021
PDF
M1.1
PDF
|
334.75 Kb
|
Added: Jun 09, 2021
PDF
M2.0
PDF
|
460.25 Kb
|
Added: Jun 09, 2021
PDF
E1.1
PDF
|
354.17 Kb
|
Added: Jun 09, 2021
PDF
E2.1
PDF
|
540.89 Kb
|
Added: Jun 09, 2021
PDF
E3.1
PDF
|
947.86 Kb
|
Added: Jun 09, 2021
PDF
Paskwaw Tower Specifications
PDF
|
1.17 Mb
|
Added: Jun 09, 2021
PDF
Instructions to Bidders
PDF
|
132.94 Kb
|
Added: Jun 09, 2021
PDF
Bid Form
PDF
|
201.79 Kb
|
Added: Jun 09, 2021
PDF
Stipulated Price Agreement
PDF
|
213.76 Kb
|
Added: Jun 09, 2021
PDF
General Conditions
PDF
|
142.5 Kb
|
Added: Jun 09, 2021
PDF
Supplementary Conditions
PDF
|
109.47 Kb
|
Added: Jun 09, 2021
PDF
General Requirements Sections 01010-01020-01100
PDF
|
25.89 Kb
|
Added: Jun 09, 2021
PDF
Gen Requirements Section 01200
PDF
|
35.2 Kb
|
Added: Jun 09, 2021
JPEG
Interior Dorm Photo A
JPEG
|
269.05 Kb
|
Added: Jun 09, 2021
JPEG
Interior Dorm Photo B
JPEG
|
250.64 Kb
|
Added: Jun 09, 2021
JPEG
Interior Dorm Photo C
JPEG
|
277.18 Kb
|
Added: Jun 09, 2021
JPEG
Interior Dorm Photo D
JPEG
|
236.86 Kb
|
Added: Jun 09, 2021
JPEG
Interior Dorm Photo E
JPEG
|
1.03 Mb
|
Added: Jun 09, 2021
JPEG
Interior Dorm Photo F
JPEG
|
196.29 Kb
|
Added: Jun 09, 2021
JPEG
Interior Dorm Photo G
JPEG
|
213.4 Kb
|
Added: Jun 09, 2021
JPEG
Interior Dorm Photo H
JPEG
|
162.86 Kb
|
Added: Jun 09, 2021
Amendment Documents:
PDF
21020 - Architectural Drawings Large Scale Complete
PDF
|
11.94 Mb
|
Added: Jun 14, 2021
PDF
21020 - Electrical Drawings Large Scale Complete
PDF
|
2.63 Mb
|
Added: Jun 14, 2021
PDF
21020 - Mechanical Drawings Large Scale Complete
PDF
|
2.37 Mb
|
Added: Jun 14, 2021
 Jun 14, 2021 08:29 AM CST
 Jun 10, 2021 07:00 AM CST
 Jun 24, 2021 02:00 PM CST
Contact
Wayne Nahnybida
306-337-2593
wayne.nahnybida@uregina.ca
Response Address
University of Regina
GG221 3737 Wascana Parkway
Regina, SK, Canada
S4S 0A2

wayne.nahnybida@uregina.ca
Competition Information
Open
721010
University of Regina
Paskwaw Student Residences Dorm Renos Phase 3
Invitation to Tender
No
The Competition detail was successfully retrieved. Jun 16, 2021 08:43 AM CST