Request for Qualifications for Construction Management Services for the Waterworks Program – Back Ya -- RFSQ25-0439
The City of Saskatoon intends to prequalify a short list of three (3) respondents as described in Appendix A. After evaluating respondents’ submissions, the City intends to issue a Request for Proposal (RFP) to the short-listed respondents for award of a Construction Management at-Risk (CMAR) Contract.
The Project is to be designed and constructed in two phases using the CMAR delivery method:
Phase I, Preconstruction Services, will include constructability reviews, value engineering, estimating, scheduling activities and procurement planning. Phase I is completed when there is agreement on the Project schedule and price—whether it be a guaranteed maximum price (GMP) or a lump sum. The City intends to take the design to nearly 100% completion within the Phase I period.
Phase II, Construction Services, in which the CMAR assumes the general contractor role, including procurement of subcontractors and vendors, self-performance of certain elements of the construction (where permitted and at the City’s discretion), and full construction and commissioning.
City’s Objectives
By selecting the CMAR delivery method for this Project, the City expects the CMAR to collaborate closely with the City and the Designer during Phase I to develop a design that achieves the City’s objectives at a mutually agreeable GMP or lump sum price for delivery of the Project. The City also expects the CMAR to construct the Project, as designed, within the agreed-on price and schedule, through commissioning and startup. The following Project-specific objectives are provided to give respondents a better understanding of the Project and the work to be performed.
Safety: Implement an effective safety program incorporating industry best practices.
Cost: Minimize capital and lifecycle cost.
Quality: Deliver the proposed facilities consistent with the Project design and specifications.
Maintenance of operations: Avoid impacts to existing operations due to construction activity and provide/maintain temporary infrastructure where required.
Risk: Achieve an optimal balance of risk allocation between the City and the CMAR.
Trial for Autodesk Construction Cloud (ACC) Build: Implement use among all parties.
Trial for contract delivery: Implement CMAR contract model to establish lessons learned for future projects.
Solicitation documents for this procurement can be found on saskatoon.bidsandtenders.ca
All respondents must register on the City’s electronic bidding system.
This will enable the respondent to download the solicitation document, ask questions, receive addenda and email notifications, and submit their bid through the bidding system.
Submission Deadline: 2:00:p.m. SK Time,Tuesday, September 23, 2025.
|
Aug 21, 2025 04:29 PM CST
|
|
Aug 21, 2025 04:00 PM CST
|
|
Sep 23, 2025 02:00 PM CST
|
Jill Schneider
306-975-3230
jill.schneider@saskatoon.ca
City of Saskatoon
222-3rd Avenue North
Saskatoon, SK, Canada
S7K 0J5
Competition Information
Open
|
RFSQ25-0439
|
City of Saskatoon
|
Request for Qualifications for Construction Management Services for the Waterworks Program – Back Ya
|
Request for Qualifications
|
No
|
The Competition detail was successfully retrieved. Sep 17, 2025 11:17 PM CST