EB Campbell - Power Canal Slumping Remediation -- 1013955

This Contract is to procure construction services for E.B. Campbell Hydroelectric Station (EBC) Power Canal Slumping remediation and erosion protection in two phases. The power canal, 4.8km long, connects Tobin Lake to the powerhouse intake. The canal requires slope failure repairs, tension crack repair, and erosion protection at 16 identified sites. Contractor shall supply all the material, equipment and labour to complete the Work as per specification, drawings, and permit requirements.

This Request for Proposal is available on MERX, and all amendments, addenda, clarifications, and further instructions will also be posted on MERX.  Documents can be downloaded at https://www.merx4.merx.com/saskpower.

Competition Documents:
 Oct 05, 2024 12:15 AM CST
 Oct 05, 2024 12:15 AM CST
 Nov 01, 2024 03:00 PM CST
Contact
Harsangeet Ghuliani
306-566-2797
procurementinquiries@saskpower.com
Response Address
Saskatchewan Power Corporation
8SE - 2025 Victoria Avenue
Regina, SK, Canada
S4P 0S1
Competition Information
Open
1013955
Saskatchewan Power Corporation
EB Campbell - Power Canal Slumping Remediation
Request for Proposal
No
The Competition detail was successfully retrieved. Oct 23, 2024 04:27 PM CST