Sturgis Composite School Roof Replacement Sections 7 &8 -- 1053

Sealed Bids will be received by RMIS Engineering (RMIS) for a roof replacement tender. The work will include for the removal of approximately 5,750 ft2 (534 m2) of existing BUR roof system and the installation of a new SBS roof system.

The bids shall be stipulated sum. Partial or incomplete bids will not be accepted. Limited unit price work is included. The Work is anticipated to begin upon award; the completion date is August 14, 2026.

A mandatory on-site review of the project for all interested Bidders has been set for 10:00AM on Tuesday, January 20, 2026. Bidders must attend in order for their bid to be considered. RMIS reserves the right to reschedule the time and date of the review. Electronic Copies of the Tender Documents are available at www.rmiseng.ca under the Contractors link. For questions, contact engineering@rmiseng.ca.

No additional information for this competition.
Competition Documents:
PDF
Sturgis - IFT Specifications.pdf
PDF
|
1.46 Mb
|
Added: Jan 14, 2026
PDF
Sturgis - IFT Drawings.pdf
PDF
|
1.14 Mb
|
Added: Jan 14, 2026
 Jan 14, 2026 02:15 PM CST
 Jan 14, 2026 02:15 PM CST
 Feb 19, 2026 02:00 PM CST
Contact
Shawn Crow
engineering@rmiseng.ca
Response Address
Good Spirit School Division
5B Schrader Drive, Highway 9 North
Yorkton, SK, Canada
S3N 3Z4
Competition Information
Open
1053
Good Spirit School Division
Sturgis Composite School Roof Replacement Sections 7 &8
Invitation to Tender
No
The Competition detail was successfully retrieved. Jan 15, 2026 09:47 PM CST