Swift Current Comprehensive High School Accessibility Project -- CSD-SCCHS-24077
Accessibility upgrade project that includes wheelchair accessible ramps and handrails at 3 locations within the Swift Current Comprehensive High School located at 1100 11th Ave NE Swift Current, Saskatchewan.
Substantial completion date of August 16, 2024
A site walkthrough for the contractor will be held on Thursday May 2, 2024 at 1:00pm local time. Contractors are to meet at the main South entrance of the school to sign in. Parking is available in the South parking lot.
Contractors must advise Ward Peters with 1080 Architecture Planning + Interiors by emailing ward@1080architecture.com by Wednesday, May 1 at 3:30pm with their intentions to attend the walkthrough.
No additional information for this competition.
Competition Documents:
PDF
22044 Swift Current Comp Ramps IFT Drawings.pdf
PDF
|
1.97 Mb
|
Added:
Apr 25, 2024
PDF
22044 Comp Ramp IFT Specification.pdf
PDF
|
1.26 Mb
|
Added:
Apr 25, 2024
|
Apr 25, 2024 05:00 PM CST
|
|
Apr 25, 2024 05:00 PM CST
|
|
May 09, 2024 02:00 PM CST
|
Devin Martens
306-778-9200
devinmartens@chinooksd.ca
Chinook School Division No. 211
Box 1809
Swift Current, SK, Canada
S9H 4J8
Competition Information
Open
|
CSD-SCCHS-24077
|
Chinook School Division No. 211
|
Swift Current Comprehensive High School Accessibility Project
|
Invitation to Tender
|
No
|
The Competition detail was successfully retrieved. May 07, 2024 06:10 PM CST