Swift Current Comprehensive High School MCC Replacements -- CSD-SCCHS-13466

The Chinook School Division is taking bids from qualified Electrical Contractors to complete work associated with the replacement of Motor Control Centres and feeds at Swift Current Composite School in Swift Current, SK.  The project involves the provisions of two (2) new motor control centres that will house combination type starters and fused disconnect switches. Also, provisions of standalone wall mounted combination starters and fused disconnect switches will be required for the replacement of one (1) existing motor control centre. The project also entails provisions of new feeders and terminations to each load (motors, transformers, breaker panels, etc.) and new local disconnect switches adjacent to each existing motor. New concrete housekeeping pads and removal of the existing motor control centres are also required as part of this project.

 

Substantially perform by March 3, 2022

A visit to project site has been arranged for Bidders as follows: Swift Current Composite School, 1100 11th Ave NE, Swift Current, Saskatchewan – Thursday October 21,  2021 at 10:00 AM local time.  Initially meet at the north exterior Boiler Room door.

All bidders are required to pre-register for the walkthrough.

Masks and hand sanitization shall be utilized by all personnel attending the site meeting.  Masks and sanitization shall be provided by individual Contractors, Chinook School Division will not provide masks or hand sanitizing stations. Use of hand sanitizer, or handwashing, will be required upon entry and exit to the building.

Anyone travelled out of side of Canada in the past 14 days, from date of walk through, will not be permitted entry to the building.
Anyone presenting COVID-19 symptoms will not be permitted at the walk through.
Social distancing must be maintained while on site.

The Chinook School Division will be implementing a "Proof of Vaccination" /or negative test for all workers on site November , 2021

CHINOOK SCHOOL DIVISION

Tel: (306) 778-9200 ext. 3233

Dan Olmsted, Supervisor or Maintenance

dolmsted@chinooksd.ca

Competition Documents:
PDF
SCCHS MCC Replacements - SPECIFICATIONS - IFT.PDF
PDF
|
2.14 Mb
|
Added: Oct 13, 2021
PDF
SCCHS MCC Replacements - DRAWINGS - IFT.PDF
PDF
|
1.76 Mb
|
Added: Oct 13, 2021
PDF
ccdc2e - 2008.pdf
PDF
|
890.63 Kb
|
Added: Oct 13, 2021
 Oct 14, 2021 07:00 AM CST
 Oct 14, 2021 07:00 AM CST
 Oct 28, 2021 02:00 PM CST
Contact
Andy Lang P. Eng
306-569-1303
andy.langl@ritenburg.com
Response Address
Ritenburg and Associates Ltd.
#200-222 Albert Street
Regina, Saskatchewan
306-569-1303
306-569-1307
Competition Information
Open
CSD-SCCHS-13466
Chinook School Division No. 211
Swift Current Comprehensive High School MCC Replacements
Invitation to Tender
No
The Competition detail was successfully retrieved. Oct 21, 2021 05:30 AM CST