Interim Repairs for Water Control Structure at Echo Lake Dam -- WSA-2024-25OE-0007

The scope of work is to provide construction services to conduct repairs at the water control structure at the Echo Lake Dam to extend the structure for an approximate 10 year period. The specific scope includes:

  1. Removal of sand bags and metal debris, and relocation of sediment on the existing control structure slab.
  2. Replacement of all existing wooden bearing blocks within the stoplog/gate slots with new wooden bearing blocks.
  3. Installation of new steel pier plates upstream of all existing stoplog/gate slots.
  4. Replacement of all existing wooden stoplog packs with new wooden stoplog packs.
  5. Replacement of the existing riparian outlet gate and associated components with a new steel bulkhead.
  6. Replacement of the existing lattice barrier on the north side of the timber work platform with a new lattice barrier.
  7. Removal of the existing corrugated plastic half pipe and construction of a new rock rip rap drainage swale.
  8. Providing temporary measures to create still water conditions within each control structure bay to facilitate the underwater work.
  9. Removal of sediment bar at the entrance to the channel.
  10. Repairs to the north abutment.

WSA is a Treasury Board Crown corporation within the meaning of The Crown Corporations Act, 1993 (Saskatchewan) that is governed by The Water Security Agency Act (Saskatchewan). WSA is responsible for water management in the Province of Saskatchewan, which includes managing the Province’s water supply, protecting water quality, ensuring safe drinking water and the treatment of wastewater, reducing flood and drought damage, protecting aquatic habitat, and managing 72 dams and related supply channels.

Competition Documents:
PDF
RFQ Submission Checklist
PDF
|
90.14 Kb
|
Added: Apr 19, 2024
PDF
WSA Vegetation Management Plan
PDF
|
10.79 Mb
|
Added: Apr 19, 2024
PDF
Appendix E - Prime Contractor Designation Letter
PDF
|
173.77 Kb
|
Added: Apr 19, 2024
XLSX
Appendix C - Pricing Table
XLSX
|
13.32 Kb
|
Added: Apr 19, 2024
PDF
Appendix B - Submission Form
PDF
|
152.14 Kb
|
Added: Apr 19, 2024
PDF
Appendix A - Form of Agreement
PDF
|
928.32 Kb
|
Added: Apr 19, 2024
PDF
RFQ for Interim Repairs for Water Control Structure at Echo Lake Dam
PDF
|
607.71 Kb
|
Added: Apr 19, 2024
Amendment Documents:
PDF
Appendix A - Form of Agreement - Schedule G
PDF
|
12.76 Mb
|
Added: Apr 19, 2024
 Apr 19, 2024 03:07 PM CST
 Apr 19, 2024 10:00 AM CST
 May 21, 2024 04:00 PM CST
Contact
Lee Peters, M.Eng., P.Eng., PMP
wsa.inquiries@kgsgroup.com
Response Address
Water Security Agency
Submissions must be sent by email to wsa.tenders@kgsgroup.com with the competition title and number prominently indicated in the subject line and the full legal name of the respondent in the body of the email.
Competition Information
Open
WSA-2024-25OE-0007
Water Security Agency
Interim Repairs for Water Control Structure at Echo Lake Dam
Request for Quotation
No
The Competition detail was successfully retrieved. May 05, 2024 10:57 PM CST