Washout Mitigation Design and Construction Supervision -- SX6409
Two washouts have been identified and determined for mitigation in the natural gas transmission system on pipelines 16.0300.100 Hatton - Success (South) NPS 14, and 05.0900.100 St. Isidore De Bellevue NPS 2. TransGas is seeking alternative mitigation solutions for HDD (horizontal directional drilling) replacement. Proponents will need to provide sound design and construction supervision for both sites if the sites are applicable for alternative mitigation methods. A more specific description of the project will follow in a Request for Proposal
SaskEnergy/TransGas is committed to the promotion of the industrial and economic growth of the NWPTA region. SaskEnergy/TransGas may choose to only accept bids from NWPTA region suppliers or give preference to bidders who are NWPTA region suppliers. SaskEnergy/TransGas has the sole, absolute and final discretion and authority to determine whether a bidder is a NWPTA region supplier.
This EOI and any resulting RFP is expected to pertain to and enable SaskEnergy/TransGas to conduct its mandated business and ability to deliver for resale, natural gas services to SaskEnergy customers, and therefore be exempt from the application of the Canadian Free Trade Agreement and the Canada-EU Trade Agreement.
No additional information for this competition.
Award Documents:
Award Details
SNC Lavalin Inc.
Saskatoon, Sk
$0.00
Apr 02, 2019
SNC Lavalin Inc.
|
Saskatoon, Sk
|
$0.00
|
|
Apr 02, 2019
|
|
Jan 24, 2020 12:05 PM CST
|
|
Jan 11, 2019 02:00 PM CST
|
|
Jan 18, 2019 02:00 PM CST
|
Brent Hales
306-777-9527
buyer2@saskenergy.com
SaskEnergy Incorporated
300-1777 Victoria Avenue
Regina, SK, Canada
S4P 4K5
(306)522-2177
Competition Information
Awarded
|
SX6409
|
SaskEnergy Incorporated
|
Washout Mitigation Design and Construction Supervision
|
Expression of Interest
|
No
|
The Competition detail was successfully retrieved. Apr 23, 2024 08:09 PM CST