Structural Upgrade Hague School -- 206-2021-03

The scope of Work consists of the structural reinforcement of approximately 991m2 (10,667ft2) of existing flat roof joists and floor joists, replacement of suspended and gypsum board ceilings and electrical renovations to accommodate the structural work at Hague School located at 325 
Saskatchewan Ave, Hague, SK. Except as otherwise  specified,  the  Work  shall  include  the  supply  of  all  labour,  equipment, materials, fittings, fixtures and services necessary or reasonably incidental to the complettion of all work shown on the drawings and as specified.

 

A site walk through has been scheduled for Friday, May 7(date), between 9:30 and 11:00 to allow for small groups to accommodate social distancing.

All contractors must pre-register for the walkthrough by emailing Ward Peters at ward@1080architecture.com by noon on May 6th.

Confirm number in your party to attend walkthrough in email.

A schedule will be established based on first come first served and will be distributed the day before.

Please be advised that masks must be worn in the school and parties attending are responsible for their own masks.

No one will be allowed to enter if they have been out of the country and back in Canada for less than two weeks.

No one who is feeling unwell or carrying flu like symptoms will be permitted into the space.

Social distancing is to be maintained during the walkthrough.

Use of hand sanitizer or hand washing will be required upon entering and exiting the facility.

Contractors visiting the site will meet at the front entrance of the school.

All attendees will be required to complete the school divisions online COVID screening on the day of the walk through. The link to the
screening website will be sent when your walk through time has been
confirmed.

Competition Documents:
Amendment Documents:
Award Documents:
Award Details
PCL Construction Management
Saskatoon, SK
$336,300.00
Hague School Structural Upgrade
May 17, 2021
 Jul 02, 2021 02:21 PM CST
 Apr 26, 2021 09:30 AM CST
 May 13, 2021 02:00 PM CST
Contact
Ward Peters
ward@1080architecture.com
Response Address
1080 Architecture, Planning + Interiors
ward@1080architecture.com

Competition Information
Awarded
206-2021-03
Prairie Spirit School Division No. 206
Structural Upgrade Hague School
Invitation to Tender
Yes
The Competition detail was successfully retrieved. Apr 25, 2024 11:09 AM CST