Structural Upgrade Hague School -- 206-2021-03
The scope of Work consists of the structural reinforcement of approximately 991m2 (10,667ft2) of existing flat roof joists and floor joists, replacement of suspended and gypsum board ceilings and electrical renovations to accommodate the structural work at Hague School located at 325
Saskatchewan Ave, Hague, SK. Except as otherwise specified, the Work shall include the supply of all labour, equipment, materials, fittings, fixtures and services necessary or reasonably incidental to the complettion of all work shown on the drawings and as specified.
A site walk through has been scheduled for Friday, May 7(date), between 9:30 and 11:00 to allow for small groups to accommodate social distancing.
All contractors must pre-register for the walkthrough by emailing Ward Peters at ward@1080architecture.com by noon on May 6th.
Confirm number in your party to attend walkthrough in email.
A schedule will be established based on first come first served and will be distributed the day before.
Please be advised that masks must be worn in the school and parties attending are responsible for their own masks.
No one will be allowed to enter if they have been out of the country and back in Canada for less than two weeks.
No one who is feeling unwell or carrying flu like symptoms will be permitted into the space.
Social distancing is to be maintained during the walkthrough.
Use of hand sanitizer or hand washing will be required upon entering and exiting the facility.
Contractors visiting the site will meet at the front entrance of the school.
All attendees will be required to complete the school divisions online COVID screening on the day of the walk through. The link to the
screening website will be sent when your walk through time has been
confirmed.
Award Documents:
Award Details
PCL Construction Management
Saskatoon, SK
$336,300.00
Hague School Structural Upgrade
May 17, 2021
PCL Construction Management
|
Saskatoon, SK
|
$336,300.00
|
Hague School Structural Upgrade
|
May 17, 2021
|
|
Jul 02, 2021 02:21 PM CST
|
|
Apr 26, 2021 09:30 AM CST
|
|
May 13, 2021 02:00 PM CST
|
Ward Peters
ward@1080architecture.com
1080 Architecture, Planning + Interiors
ward@1080architecture.com
Competition Information
Awarded
|
206-2021-03
|
Prairie Spirit School Division No. 206
|
Structural Upgrade Hague School
|
Invitation to Tender
|
Yes
|
The Competition detail was successfully retrieved. Apr 22, 2025 01:41 PM CST