Town of Gull Lake Well Control Building Stage 2 -- 2021-4633

Sealed bids marked "Well Control Building Stage 2" project will be received through the online bidding system, up to 2:00 p.m. local time on July 5, 2022. Bids submitted after the online bidding system closing time will not be accepted by the online bidding system. The time as indicated by the declining time clock on the online bidding system shall be the official time for closing. 

The Work involves but is not limited to the following: 
• Supply, installation and commissioning of process mechanical, building mechanical, electrical instrumentation and controls equipment in a new well control building. The well control building concrete slab, in-slab piping and building and are being constructed by the Town of Gull Lake  
• Supply, installation and commissioning of process mechanical, electrical, instrumentation and controls equipment for Well 3 which was drilled 2021 approximately 140 m from the well control building.   
• Construction of a raw water pipeline from Well 3 to the well control building and from the well control building to the exiting raw water pipeline to Town.   

The site grading, roadways and fencing will be completed by the Town after completion of this contract. 

Contract Documents will be available on the Bids and Tenders website on or after June 21, 2022. Bidders are required to check for any updated information and addenda issued before the closing date and time on the online bidding system; http://ae-sk.bidsandtenders.ca. 

 

Technical inquiries by bidders are to be directed to Michael Walker, P.Eng., PE, PMP at 306-271-0873 or via email at walkerm@ae.ca. 

A virtual bidders’ briefing is scheduled for Virtually on June 28, 2022 at 10:00 a.m.  A Teams Meeting will be set up with all interested parties that have accessed contract documents. It is in the best interest of the bidder to attend this briefing. 

Bids must be accompanied by the specified Bid Bond and Consent of Surety Company payable to the Town of Gull Lake . 

The lowest or any bid will not necessarily be accepted. 

Competition Documents:
Amendment Documents:
 Jul 05, 2022 02:03 PM CST
 Jun 21, 2022 03:00 PM CST
 Jul 05, 2022 02:00 PM CST
Contact
Dawnette Peterson
306-672-3361
gulllaketown.admin@sasktel.net
Response Address
Town of Gull Lake
Box 150
Gull Lake, SK, Canada
S0N 1A0
306-672-3777
Competition Information
Closed
2021-4633
Town of Gull Lake
Town of Gull Lake Well Control Building Stage 2
Invitation to Tender
No
The Competition detail was successfully retrieved. Apr 26, 2024 02:45 PM CST